AOG Support +41 58 310 31 13
New Landing Gear Project on a B737 for AMAC Aerospace

New Landing Gear Project on a B737 for AMAC Aerospace

AMAC Aerospace are proud to announce a newly signed maintenance contract on a Boeing B737-NG. The privately-owned aircraft will arrive in April for a landing gear overhaul on short notice. A Boeing 747 has four main landing gears in its center section, as well as its...

read more
New Arrivals at AMAC’s new Hangar 5

New Arrivals at AMAC’s new Hangar 5

By the end of March, a Gulfstream G450 shall be positioned in AMAC’s hangar 5 in Basel, Switzerland. The privately-owned aircraft will undergo a Pre-Purchase Inspection (‘PPI’) as well a registration change. A second Gulfstream G450 is planned to arrive by the end of...

read more
New awarded Maintenance Contracts on Bombardier Aircraft

New awarded Maintenance Contracts on Bombardier Aircraft

AMAC Aerospace opened its hangar doors of its recently finished hangar 5 to welcome two Bombardier aircraft, a Global 6000 and a Challenger 300. The Global 6000, a large business jet with a range of 6,000 nm, arrived end of March in Basel, Switzerland. AMAC’s...

read more
New Hangar No. 5 operational

New Hangar No. 5 operational

After only 12 months of construction time, the latest hangar of AMAC Aerospace has opened its doors to welcome the first mid-size jets. The new building offers space for up to 7 mid-size jets and adds 4’850m2 respectively 30’000m2 of new apron to the four existing...

read more
New Maintenance Contract on a Boeing B737-NG

New Maintenance Contract on a Boeing B737-NG

In March, AMAC Aerospace opened its hangar doors to welcome a Boeing B737-NG. The long-term customer sent the narrow-body aircraft for a maintenance check to Basel, Switzerland. The maintenance contract on the privately-owned aircraft includes a 1A and 2A Check as...

read more
Expansion of project scope on a MD-87

Expansion of project scope on a MD-87

AMAC Aerospace welcomed a McDonnell Douglas MD-87 for a 6C-Check in February. While AMAC’s maintenance team were performing the comprehensive maintenance checks the client decided to expand the project scope by replacing the carpet of the interior cabin and having the...

read more

Archives